Enterprise rollout
Roll out site by site, on a plan.
Multi-facility organizations often start with a pilot site, standardize the operating model, then roll out across the network.
Phased rollout
- 01Pilot siteProve the operating model.Joint
- 02StandardizeFinalize configuration and training.Joint
- 03Roll outAdditional sites in planned waves.Joint
- 04GovernShared roles, reporting, and change control.Your team
What a pilot needs to prove
Choose a site with representative work, including receiving, processing, inventory, and client reporting. Agree on the records that will be migrated, the locations and roles that need configuration, and the integrations the pilot depends on. Test ordinary work and exceptions before setting the next wave.
After the pilot, document which settings should be shared across facilities and which must vary by site. Compare counts, weights, and open work with the source system, then have each team lead validate its workflow. The next site should begin with those decisions recorded instead of repeating discovery from scratch.
Questions for the rollout plan
- Which site is the pilot, and what makes it representative?
- Which contracts, grades, roles, and reports should be standard?
- What data and open work move in each wave?
- How will each site validate its counts and workflows?
- Who approves changes between waves?